Urgent repair of Hynds Manhole Riser for installation the next day
Before: Crack from top to bottom due to cartage from Auckland to Christchurch.
Photo of the damage, photo showing the preparation and photo of repair completed.
Repairs completed in under two hours with the Gebbie Tech System. The cementitious mortar is still drying. The repair will dry to match the tank.



Before
During Repair
Completed < 2 hours
Earthquake damage to Railway Bridge in Kaikoura
Before: Cracks were evident from hairline to 3mm.
During repair: Cracks were filled with Roadware 10 Minute Mender
After: Approximately 40 metres of crack was repaired in two days.

Before

During

Injection Completed